Estimating hydropower generation potential of the Metolong dam

dc.contributor.authorMoerane, Mokhothu Emmanuel
dc.date.accessioned2024-02-05T13:14:40Z
dc.date.available2024-02-05T13:14:40Z
dc.date.issued2022-10
dc.description.abstractMetolong dam is located 30 km east of Maseru town, with the dam retaining wall built inside the Phuthiatsana River. The purpose of the dam is to supply portable water to Maseru, Roma Mazenod, Morija and Teyateyaneng. The Instream Flow Requirement (IFR) given post Metolong dam construction and meant to sustain life downstream of the dam was used to estimate how much hydropower can be generated from IFR. Even though the study is aimed at assessing the hydropower generation potential of the dam, it did not address the sedimentation rate occurring inside the dam per year and how much storage capacity is lost due to sedimentation. Microsoft excel spreadsheet is used to estimate how much electricity can be generated from IFR and to examine how the water temperature affects the electricity projections. The results show that the dam has the capacity to produce 65kW from In-stream flow requirement (IFR) in April, as a month with the highest IFR and 7 kW in September, as a month with the lowest IFR. These power production figures are studied together with the water temperature in three scenarios to observe the effects of water temperature on power production. The outcome is that they seem to have no significant effect. The power production is based on when a Radial flow PAT (Pump As Turbine) of 0.6 efficiency and generator of 0.955 efficiency are attached at IFR release point. The dam head ranges between 23 m – 44 m for IFR, with water releases of 0.01 m3/s – 0.3 m3/s. This power can be used for distributed generation or net metering by the Water and Sewage Company (WASCO). The financing of the project is not expected to exceed $50 000 given the condition of the already installed penstock at the recovery period of less than 4 years factoring in fluctuations of power brought by those of IFR for environmental purposes downstream of Metolong dam.en
dc.description.sponsorshipNational Manpower Development Secretariaten
dc.identifier.urihttps://hdl.handle.net/20.500.14155/1906
dc.language.isoenen
dc.publisherNational University of Lesothoen
dc.subjectHydropower generation, Metolong dam, Instream flow requirementen
dc.titleEstimating hydropower generation potential of the Metolong damen
dc.typeMaster's Thesisen
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Thesis-Estimating-Moerane-2022.pdf
Size:
1.22 MB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.86 KB
Format:
Item-specific license agreed upon to submission
Description: